23-009 | MFG Chemical Utility Room Code Upgrade
Updated: Feb 25, 2024
Dalton, GA | Apr 2023
![](https://static.wixstatic.com/media/7cbb22_02225a0c231f484aac2fa462b61c6487~mv2.jpg/v1/fill/w_980,h_1307,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/7cbb22_02225a0c231f484aac2fa462b61c6487~mv2.jpg)
An atypical project for JBrennon, we upgraded an out of code utility room with fire rated walls and ceilings. Construction activities include metal stud framing, installation of 2-hr rated walls, 2-hr rated metal frame and door, and fire caulking. The room was constructed around existing utilities and within an active chemical facility.
![](https://static.wixstatic.com/media/fbc870_c3c26d0b41c64d3f8a8bbe57e47414b2~mv2.png/v1/fill/w_980,h_46,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/fbc870_c3c26d0b41c64d3f8a8bbe57e47414b2~mv2.png)
![](https://static.wixstatic.com/media/fbc870_5d0e5cc379e34722ba332dbcd9840158~mv2.png/v1/fill/w_980,h_248,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/fbc870_5d0e5cc379e34722ba332dbcd9840158~mv2.png)