top of page
Writer's pictureBrent Smith

21-099 | Electric Power Board (EPB) of Chattanooga Design-Build East Operations Center

Updated: May 26, 2023

Chattanooga, TN | Feb 2022 - Jun 2022


Note: Photo is property of TAC. Taken from JBrennon's conceptual design proposal.

This design-build opportunity arose from JBrennon's recommendation to EPB Chattanooga that a conceptual, design-build approach should be offered to select vendors for competition and construction of a new operations center in Chattanooga, TN. JBrennon and The Architecture Collaborative (TAC) of Knoxville, TN, teamed up with a variety of engineers, consultants, and subcontractors to propose upon the site development near Volkswagen Chattanooga. Though JBrennon was not selected, it was a finalist. The design-build proposal included the below details for our proposed, LEED Gold certified building and out parcel developments:


The new, sustainably designed EBP East Operations Facility will be located on a 17.138-acre parcel at 7362 Volkswagen Drive (south side), east of Bonny Oaks Drive in Chattanooga, Tennessee. The project requires site clearing and demolition, grading, building construction, parking, sidewalks, walls, drainage, utilities, landscaping, and other infrastructure improvements. Construction includes:

  • 5,800 SF 1-story conditioned and sprinkled, conventional-build office building

  • 26,500 SF natural gas heated, and sprinkled warehouse PEMB storage building connected to the 5,800 SF 1-story office building

  • 2,500 SF natural gas heated PEMB maintenance shop

  • 69,518 SF covered and dry sprinkled dock and vehicle parking PEMB type structure; includes:

    • (40) 2 covered dock parking spaces (12’ x 30’)

    • Two (2) 4 covered dock parking for up to 73’ tractor-trailer deliveries

    • Twenty (20) covered parking for 13’ x 30’ spaces (Large Trucks)

    • Forty-two (42) covered parking for 9’ x 20’ spaces (Fiber Vans and other fleet vehicles)

  • Eight (8) vehicle charging stations included in covered parking for fleet vehicles at 59,100 SF covered storage area of PEMB type structure

  • 77,000 SF gravel outside storage laydown area

  • 102 employee parking spaces

  • Solar orientation for maximum solar panel design

  • LEED BD+C Gold Certification

  • Furnishings for Offices, Command Center, Locker Rooms & Fitness Center

  • Outdoor employee patio amenities for breaks and fitness activities

  • Native-no irrigation landscape design

The office building will be rated for a windshear of 115 mph with a shelter component up to 200 mph and designed to a LEED BD+C Gold Certification standard. Key features of the site design include:

  • Solar panels that can provide approximately 12% of the facilities connected power load

  • (12) Electric vehicle charging stations for fleet and employee parking

  • Energy management system required for commissioning

  • Locally sourced siding less than 200 miles from the jobsite

  • Native/adapted landscaping

  • Daylighting through skylights at storage warehouse & sky views in offices





 




Recent Posts

See All

Comments


bottom of page